MERO TSK Raised Floor & Suspended Celling

MERO TSK Raised Floor & Suspended Celling

The activity of the Company MERO was Recorded in 1928, when Dr.-Ing.Dr. hc Max Mengeringhausen in Berlin built the ­first building service engineering company Germany. In 1948, he moved the company headquarters to Wurzburg. Form his idea to offer with industrially prefabricated elements series economical and innovative, customized solutions for the construction industry, he developed the late’3os the MEngeringhausen RO hrbauweise.

 

  • Fiber-reinforced calcium sulfate Panel Materials
  • Heavy Load bearing capacity
  • Up to 65% perforation per perforated panel
  • Air flow Adjustable grille
  • Panel thickness (without covering) : 23 – 39 mm
  • Panel surface & bottom: galvanized steel sheet
  • Pedestal materials: galvanized steel
  • Fire resistance F30 or F60